Wastewater Application Notes
-
Process Optimization For Flow Measurement
4/29/2021
The Saalfeld-Rudolfstadt Association in Germany must rely on cutting-edge technologies that optimize flow measurement in order to allow for smooth processes and supply 82,000 inhabitants with clean drinking water.
-
2 Applications That Triggered The Rise Of Coriolis Flow Measurement
11/1/2017
Coriolis measurement has been adopted as a default technology in many application scenarios due to its high accuracy and immunity to process variables (temperature, pressure and flow profile). However, Coriolis wasn't always widely accepted. Two applications, in particular, helped what was once a nascent flow measurement technology gain a foothold in the marketplace.
-
Scrubber Application
1/27/2022
This customer supplies district heating and electricity for the region of Sønderborg. For one of their waste applications a MAG meter failed within 6 months, and was successfully replaced with a Panametrics Aquatrans AT600.
-
Reduced Bore Electromagnetic Flowmeter
10/29/2021
Being able to accurately measure both the quantity and rate of water passing through a water distribution system is crucial to gain an informed understanding of overall efficiency. As such, achieving a measurement that is exact as possible can have a significant impact on key areas. This includes supply planning, maintenance, resource deployment, leakage detection and the overall environment.
-
Process Monitoring And Control For Increased Productivity And Efficiency
4/9/2012
The Littleton/Englewood wastewater treatment plant, Colorado, put in place processes to effectively monitor the levels of ammonia in their wastewater treatment.
-
Aerated Biological Nitrogen Removal
7/16/2013
Excess ammonia in receiving waters causes algal blooms that decrease oxygen levels. For this reason, many wastewater treatment plants (WWTPs) must limit ammonia in discharge. Mike Rousey, Hach Company
-
Application Note: Employing Best Water Quality Monitoring Practices To Reduce Runoff During Construction
8/4/2011
Under proposed EPA stormwater runoff guidelines, construction site operators will be required to actively monitor or sample stormwater discharges daily. The enhanced effluent rules take effect in August 2011 for construction sites that disturb 20 or more acres and February 2014 for sites that disturb 10 or more acres, and they may stipulate a strict numerical limit of less than 280 NTU for average turbidity (sediment in water) on any day. By YSI
-
Real-Time Water Quality Data For Agriculture
9/23/2020
We arm farmers with mission-critical water data to help enhance crop yield and taste. KETOS delivers valuable insights for fluctuations in deficiency and toxicity.
-
LLT100 Laser Level Measurement In Water And Wastewater
3/12/2020
In the water and wastewater market segment, the LLT100 laser level transmitter provides an efficient way to measure levels of liquids.
-
Precipitant Savings Through Optimized Phosphate Elimination With Integrated Predictive Diagnostics
4/18/2017
Dosing of the precipitant was adjusted manually based on the laboratory measurement value of the daily composite sample and so was unable to respond to possible peaks. Although being compliant with the effluent limits, the values observed fluctuate between 0.2 and 0.8 mg/L.