Wastewater Disinfection WHITE PAPERS

  1. UV System Saves Energy And Reduces Maintenance

    After a 17-year run, a plant’s UV disinfection system was limping toward the finish line. The city needed to identify a replacement UV system that fit into the same channel, offered lower power consumption, and contained a practical ease of maintenance to reduce the amount of labor consumed on the equipment. The new system requires dramatically less power to run while simultaneously streamlining upkeep.

  2. Change To 3-Precursor Vacuum Generator-Feeder For ClO2 In WTP, From Batch Generator Pumping, Cuts Chemical Costs, Gains Plant Management Of Equipment

    The water treatment plants (WTP’s) manager for the city of Midlothian, TX reports significant reduction in chemical costs, gaining new management control for their generation and feed equipment, and ending a pesky maintenance burden, by switching to three-precursor vacuum generator-feed, from batch-generator-pumping, for introducing chlorine dioxide (ClO2) into their 8 MGD plant #2. As a result, he plans to make the same change at their 12 MGD plant #1.

  3. Wastewater Plant Relies On Thermal Flow Meter For Co-Gen Power Gas Blending Process

    The Rahway Valley Sewerage Authority (RVSA), which operates a large wastewater treatment plant in New Jersey, embarked on a green co-generation waste-to-energy project to power a portion of its operations. The plant’s management team became interested in pursuing the gas-to-energy power co-generation system for both environmental and cost reasons.

  4. Fluence’s MABR For Wastewater Treatment features Passive Aeration And Saves Up To 90% On Energy Costs

    The Bordeaux region of St. Thomas had a pressing need for a wastewater treatment plant that produces high effluent quality. Its existing plant was old and did not meet regulation nor industry standards. Fluence, together with its partner SD&C Inc., built an MABR-based wastewater treatment plant from the ground up, utilizing whatever existing pieces of equipment could be used from the old plant.

  5. Treatment Plant Upgrade Includes Conversion To On-Site Sodium Hypochlorite Generation To Ease Operations And Increase Safety

    Fairmont, Minnesota, known as the City of Lakes, is located in Martin County in southern Minnesota. The city’s water treatment plant serves a mix of customers including approximately 3,900 residential taps, 500 commercial and 17 industrial customers. Looking to the future, Fairmont city leaders began to investigate upgrading the city’s water treatment plant in 2010. The existing plant had been in operation for well over 70 years and relied on gas chlorine for disinfection.

  6. Packaged Wastewater Treatment For Uneven Terrain

    Storey County, NV, just southeast of Reno, needed to replace an outdated wastewater treatment plant that serves the historic communities of Virginia City and Gold Hill. The new site was on the side of a hill, presenting challenges for the design of the plant and the orientation of its processes. Also, the new plant area was entirely within a district on the National Register of Historic Places. Read the full case study to learn how the new modular design allows for an efficient wastewater treatment solution.

  7. Granular Activated Carbon: A Long-Term Solution For Meeting DPB Compliance

    When the Cobb County-Marietta Water Authority (CCMWA) anticipated the need to upgrade the Hugh A. Wyckoff water treatment plant, they turned to granular activated carbon (GAC) technology after vetting several alternatives. The plant, a wholesaler in a two-plant system, processes up to 72 million gallons per day and serves about 350,000 people. Comprising of Wyckoff and the James E. Quarles treatment plant, CCMWA is the second largest water provider in Georgia.

  8. Pure Oxygen Injection Into A Pipeline

    The Hagerstown Wastewater Treatment Plant in Maryland incorporated several plant modifications, one of which was the conversion of their disinfection process from the use of ozone to UV.

  9. Retrofit Significantly Reduces Backwash Cycle Interval, Duration And Water Use For Georgia Utility

    The North Columbus Resource Facility recently completed a $12-million replacement of its settled water filtration, removing the existing Wheeler filters, their three-part media and 10-inch poured concrete underdrains, which were no longer efficient.

  10. Mitigating Environmental Impact Of Gold Mine’s Wastewater Through Ozone Oxidation And Aquifer Re-injection

    Installing and operating an ozone oxidation system for wastewater remediation at a gold mine located in a remote region of Alaska is full of challenges.