SCADA & Automation Case Studies and White Papers

  1. Building An Invisible And Soundless Power Plant
    6/23/2017

    The Villoresi Channel, located north of Milan, was designed with the main purpose of agricultural irrigation while providing water to the city of Milan. The paths running along the canal were also used for recreational purposes and cross through some of the most beautiful natural parks in Lombardy.

  2. Sticking with Innovation That Works
    3/28/2017

    With a population of about 15,000, Steinbach is the third largest city in Manitoba and one of the fastest growing areas in Canada. The current system has been operating since 1993, an eternity in the world of technology. Because the wastewater department was already familiar with operating the existing Xylem/Flygt M&C SCADA system with Aquaview software and APP controllers, they decided to inquire what new technologies the company could offer. Read the full case study to learn more.

  3. Sticking With Innovation That Works: Steinbach, Manitoba’s Plant Upgrade
    2/16/2017

    Steinbach is the third largest city in Manitoba and one of the fastest growing census agglomeration areas in Canada with a population of about 50,000 people. Though Steinbach is primarily an agricultural community, it is also the regional economic hub of southeastern Manitoba. Due to the age of the wastewater control system, the city decided it was time for some new technology. This profile will describe the process of that upgrade and why they chose VTScada.

  4. Clay County Utility Authority Project Profile
    2/6/2017

    Clay County, located in Northern Florida, has a population of almost 200,000. In April 2016, Clay County Utility Authority (CCUA) needed a new SCADA system to monitor seven reclaimed water sites that the Authority uses to determine water storage times, using this data to route water from site to site. VTScada was selected by CCUA and their engineer.

  5. WSSC Achieves Over 60% Reduction In Hydraulic Plan Review for Water And Wastewater Systems
    12/1/2016

    Washington Suburban Sanitary Commission (WSSC) Development Services Group reviews hydraulic plans for approximately 160 proposed development plans per year. This includes water and sewer system extensions as well as approximately 172 small-site utility plans (commercial private systems) that connect to the existing water and sewer network in two large Maryland counties.

  6. Aqua+ Increases Plant Control System Design Speed By 50 Percent With Promis.e
    11/1/2016

    Khabarovsk Municipal Unitary Enterprise “Vodocanal” (Khabarovsk Vodocanal) provides water supply and sewerage facilities for the city of Khabarovsk in Russia’s Far East Federal District. As part of a program to shift from surface to underground water sources, Khabarovsk Vodocanal constructed the RUB 10 billion Tunguska Groundwater Intake Facilities to deliver 106,000 cubic meters per day (m3/d) of water to the city of Khabarovsk.

  7. Prolagos Designs Water Distribution System Delivering Energy Savings And Revenue Gains
    11/1/2016

    Prolagos, a subsidiary of Aegea Group, is responsible for providing water and sewerage services to five municipalities in Região dos Lagos, Rio de Janeiro. Prolagos manages a total water network encompassing 2,000 kilometers of distribution pipelines and accommodates for variable seasonal fluctuations ranging from 400,000 to almost 2 million inhabitants at the peak of the tourist season.

  8. Shanghai Investigation Sets BIM Standard On Ningbo Yongxin’s Urban Flood Control Project
    11/1/2016

    In response to the devastation from a 2013 typhoon that caused the Yongxin and Yongjiang rivers in Ningbo, China to overflow, Ningbo Raw Water Group Ltd. commissioned the detailed design and construction of a CNY 178 million emergency sluice pump. The pump would provide flood control measures and mitigate future flood losses to improve urban infrastructure services within the Zhejiang province. To avoid the risk of additional flooding from another typhoon, the Raw Water Group required the urban flood control project to be delivered in a demanding eight-month schedule—a process that would ordinarily take 24 months to complete.

  9. Special Gas Chlorination System Replaces Tablet System At WWTP, Providing Enhanced Safety Needed For Gas Option, While Cutting Chemical Costs
    9/1/2016

    The district manager for the Pinetop-Lakeside Sanitary District (AZ) reports that a special gas chlorination system, featuring unique components and controls, and manufacturer-supplied service, has effectively replaced a chlorine tablet system.

  10. Automated Wireless Monitoring Of Wastewater Collection Systems
    8/11/2016

    Telog Instruments, Inc. offers a comprehensive remote monitoring system, Telogers, for wastewater collection system operators. Telogers provides an automated system of collecting, archiving, analyzing, presenting, reporting and sharing data from collection system remote assets such as flow meters, rain gauges, CSO/SSO surcharge sensors, lift stations, pretreatment water quality, air quality, and pressure sensors.