AMERICAN Articles
-
The Design Decision Model® Reveals Longevity Of Ductile Iron Pipe
5/6/2019
Earlier this year, Maury D. Gaston, manager of Marketing Services for AMERICAN Ductile Iron Pipe and chairman of the Alabama Iron and Steel Council, presented at the 2019 NACE Corrosion Conference on Metallized Arc-Sprayed Zinc Coated Ductile Iron Pipe.
-
Supporting The Heart Of The Water-Energy-Food Nexus
8/20/2018
Have you ever thought about the energy required to produce and deliver water, the water and energy required to grow and deliver food, and the food required to sustain us while we do all that? This article defines and describes the water-energy-food nexus and how one company supports it.
-
Three More South Dakota Cities With 'The Need For Speed' Choose ALPHA Joint
11/16/2017
Three more cities in South Dakota – Rapid City, Sisseton and Watertown – are now using the AMERICAN Flow Control resilient wedge gate valves and fire hydrants with ALPHA restrained joint ends. The ALPHA joint restraint can quickly be installed by one person and uses only one single stainless steel bolt, saving time, labor and money.
-
For Pierre, South Dakota, ALPHA's Single-Bolt Install Is the 'Way to Go'
8/3/2017
Add Pierre, South Dakota, to the rapidly growing list of early adopters of AMERICAN Flow Control’s valves and hydrants with ALPHA restrained joint ends. Introduced last year, ALPHA saves labor, time and money.
-
Earthquake Resistant Ductile Iron Pipe, Valve, And Hydrant System
5/22/2017
Recently, ASCE released its Infrastructure Report Card, giving the nation’s drinking water infrastructure a D: in poor to fair condition and mostly below standard. Many water utilities and communities are doing the hard but necessary thing in finding the resources to upgrade their aging water infrastructure. And, for those in earthquake prone areas, hopefully considering an earthquake resistant system.
-
Making It Work: 174 Hydrants And 280 Valves Installed In 120 Days
3/16/2017
A timeline of 120 days. Construction in the middle of winter, when temperatures were frigid and snow covered the ground. Despite these challenges, Elite Excavating Company of Ohio, Inc., was able to install 174 AMERICAN Flow Control American-Darling MK 73 fire hydrants and 280 resilient wedge gate valves in sizes 6 to 18 inches in three months.
-
‘You’ve Come A Long Way, Baby’: The Making Of The Modern Day Fire Hydrant
9/22/2016
This article is in support of the Imagine a Day Without Water campaign — a national online movement to raise awareness about the value of water and water infrastructure.
-
Why Water Infrastructure Should Be The Priority
9/19/2016
This article is in support of the Imagine a Day Without Water campaign — a national online movement to raise awareness about the value of water and water infrastructure. See more articles on AMERICAN’s Imagine a Day Without Water home page.
-
The History Of Water Infrastructure And What We Can Learn From It
9/16/2016
This article is in support of the Imagine a Day Without Water campaign –- a national online movement to raise awareness about the value of water and water infrastructure. See more articles on AMERICAN’s Imagine a Day Without Water home page.
-
The Case for Trans-Basin Water Pipelines
3/11/2016
Those in the water industry know water is essential for life and brings economic value, but the economic role of water is often not as well understood by the general public. This paper reviews the history and development of our transportation, electrical, and energy infrastructure and then presents a plan for our nation’s water to be augmented from where we have it abundantly to where we badly need it.