Wastewater Treatment Videos

  1. How To Design A Sewer Lift Station In 60 Seconds
    6/12/2015

    A 60 second video about what you need to do to design a sewer lift station.

  2. Self-Priming Pump Basics Pt. 2 Failure To Prime Video
    4/12/2012

    Gorman-Rupp Service Manager Mike Austen explains issues that can lead to a failure to prime with a self-priming centrifugal pump.

  3. Aerzen Delta Hybrid Case Study Video
    2/17/2011
    The first installation of the new technology — Aerzen's Rotary Lobe Compressor — saves 30% energy usage in the Huntington, NY Wastewater Treatment plant.
  4. Winterization Tips For Compressed Air Systems
    12/16/2014

    Follow these 5 tips to make sure your compressed air system is ready for winter.

  5. Welcome To The Power Of Clarity
    9/5/2017

    Hach's breakthrough suite of software and connected instruments turns data into powerful operational insights. Watch this short video to see how Hach simplifies the complexities and brings clarity to water management.

  6. Shining a Light on Stormwater (Video)
    6/28/2012

    This video tells the story of how the community of East Bayfront converted an industrial area into a beautiful park that also acts as a neighborhood-wide stormwater treatment system, and what role the TrojanUVFit plays in the treatment train.

  7. Electromagnetic Flow Measurement Supports The Environmental Industry (MID) Video
    4/4/2012

    Endress+Hauser has been present on the water and wastewater market for decades.

  8. IDE Showcases Evaporator For SAGD Water Treatment In Canada
    5/5/2015

    IDE recently hosted exclusive guided tours of its horizontal falling film evaporator for SAGD water treatment at the fabrication shop in Calgary, Alberta. Over three days more than 120 industry professionals had the opportunity to experience IDE's SAGD Horizontal Evaporator first hand.

  9. Stickney Phosphorus Reactor Lift
    7/30/2015

    Construction of the world’s largest phosphorus recovery facility continues at our Stickney Water Reclamation Plant. On July 22, one of three reactors was lifted, rotated and placed into the building. This time-lapse video shows a portion of the process which required approximately 50 minutes to complete.

  10. ZS+Screw Blower Walk Through Video
    12/29/2010

    ZS+Screw Blower Walk Through Video