WASTEWATER RESOURCES
-
Protecting Critical Operations: Control Point Installation At A Major Military Base
5/6/2026
Discover how a military installation established a critical 8-inch line control point in just 1.5 hours under live system conditions, preserving full operational readiness and avoiding a disruptive base-wide water shutdown.
-
Minimizing Disruption And Maximizing Continuity During An Emergency Valve Installation
5/6/2026
Discover how a municipal utility executed an urgent emergency repair on an active 12-inch main in under three hours, entirely eliminating the need for neighborhood boil advisories or disruptive commercial shutdowns.
-
Targeted Isolation Enables Contractor Work Without Residential Shutdowns
5/6/2026
Discover how a regional utility deployed an inline 12-inch insertion valve in just 1.5 hours, allowing contractors to isolate active construction zones without triggering broad, disruptive water shutdowns across a residential neighborhood.
-
Service Preserved At Major Intersection During Valve Installation
5/6/2026
Discover how a major utility established a strategic control point on a live water main in just two hours, preserving continuous service to critical commercial and residential properties without relying on disruptive system shutdowns.
-
Mass Transfer Efficiency: The Most Important Metric In Ozone System Design
4/29/2026
Ozone output doesn’t guarantee performance. Learn how mass transfer efficiency determines how much ozone dissolves, drives treatment results, and impacts energy use and system design.
-
AVT - 3,000 Homes Maintained Their Water Supply Thanks To R2M And The AVT EZ Valve
4/9/2026
Protecting residential water access during emergency repairs is essential for municipal reliability. Advanced insertion technology creates permanent control points on live, pressurized lines, preventing large-scale service outages and boil-water advisories for thousands of residents.
-
AVT - Vital Fire Suppression Line Remains Live While AVT EZ ValveĀ® Is Installed
4/9/2026
Critical safety systems must remain operational during repairs. Advanced insertion technology enables the installation of permanent valves on pressurized lines without service interruptions, preventing costly facility shutdowns while ensuring constant fire suppression readiness.
-
GeoTree - Large Diameter Sewer Re-Built And Re-Lined
4/1/2026
Trenchless rehabilitation provides a sustainable alternative to traditional excavation for failing sewer infrastructure. High-performance geopolymer liners offer structural restoration in highly corrosive environments, minimizing urban disruption while preventing environmental hazards through efficient, spray-applied application techniques.
-
On-Line EZ Series Phosphorus Analyzer Allows Peace Of Mind And Prevents Permit Violations
3/27/2026
Real-time nutrient monitoring allows wastewater facilities to detect industrial spikes and prevent permit violations. By utilizing automated, hourly sampling and dual-stream analysis, operators can optimize chemical dosing and maintain consistent effluent quality.
-
Return Activated Sludge Pumps
3/27/2026
Return activated sludge pumps are critical to wastewater treatment, maintaining biological balance, ensuring efficiency, and supporting resilient infrastructure amid aging systems and emerging contaminants.