Case Study

Upgrade Of Channel Monster Cuts Wipes Problem And $78k From Electrical Bill

Source: JWC Environmental

ChannelMonster

Keeping up with both the water needs and sewage disposal of the Santa Margarita Water District has come with significant challenges, particularly due to both the increase in influent and change in the makeup and durability of the sewage running through the district’s reclaimed-water facility.

Since new Channel Monster drums were installed, the district has had zero pump-clogging issues at the facility for the last 18 months, and has returned to using two pumps at a time instead of all four. Pumping energy costs have decreased $78,000 per year and manual pump deragging has been eliminated. Read the full case study to learn more.