Case Study

One System, Many Solutions: Upgrading With MBR

Source: Ovivo

Following a pre‐selection (and pre‐purchase) process, an Ovivo MBR System was selected to upgrade/expand an old SBR‐based treatment system. The existing plant remained in service throughout construction that lasted roughly 22 months. The project was funded through a variety of sources including ARRA (Green Project Reserve) and SRF loans. Energy efficient design features allowed the City access to the Green funding and the elimination of equalization reduced the overall project cost by $1.8M. Currently, plant effluent (Class A) is recycled and used onsite. In the future, treated effluent will be reused for irrigation and maintenance purposes.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online