Wastewater Videos

  1. Self-Priming Pump Basics Pt. 1 Introduction Video
    4/12/2012

    Gorman-Rupp Service Manager Mike Austen explains the concepts of self-priming centrifugal pumps using a unique glass faced pump demonstration unit.

  2. Stories That Matter: Seeing Green In Philly
    12/11/2013

    See how we are delivering smart, sustainable stormwater management solutions for Philadelphia and changing the way the world views green infrastructure.

  3. Video: Hanna Instruments 98703 Portable Turbidity Meter
    4/14/2011
    The Hanna Instruments 98703 portable turbidity meter is perfect for stormwater testing.
  4. What Is A Combined Sewer Overflow?
    4/22/2015

    How does a combined sewer work? A representative from the Northeast Ohio Regional Sewer District (NEORSD) takes 60 seconds to draw a combined sewer and why they matter.

  5. TrojanUV Solo Lamp™ Technology (Video)
    7/1/2010

    It is no longer necessary for municipalities installing UV technology to make a choice between energy-efficiency and a small footprint.

  6. DC Water's Biodigesters
    3/3/2016

    We're turning waste to a rich soil product and capturing the methane to power our Blue Plains Advanced Wastewater Plant.

  7. OxyMem: Smart Wastewater Aeration (Membrane Aerated Biofilm Reactor, MABR)
    4/27/2016

    In this 60 second explainer video we show how OxyMem solves energy intensive wastewater treatment with smart aeration. We explain the OxyMem Membrane Aerated Biofilm Reactor (MABR) process and outline the benefits of its use.

  8. Video: Integrated Fixed-Film Activated Sludge (IFAS) From Headworks BIO
    12/14/2011

    The Integrated Fixed-Film Activated Sludge (IFAS) process is typically installed as a retrofit solution for conventional activated sludge systems that are at or beyond capacity.

  9. Drought Forum Webinar: The Growing Demand For Re-Used And Brackish Water
    5/7/2015

    The Western Governors' Drought Forum webinar “Once Marginal, Now Crucial: The Growing Demand for Re-used, Produced, and Brackish Water” explores the technological and regulatory obstacles to utilizing re-used, produced, and brackish water.

  10. Stickney Phosphorus Reactor Lift
    7/30/2015

    Construction of the world’s largest phosphorus recovery facility continues at our Stickney Water Reclamation Plant. On July 22, one of three reactors was lifted, rotated and placed into the building. This time-lapse video shows a portion of the process which required approximately 50 minutes to complete.