Article | July 29, 2022

What's In The Black-Box? – Bio-P In TDG

Source: Transcend Water

The Transcend Design Generator (TDG) now has the capability to design facilities with biological phosphorus removal!

We’d like to highlight some details about the background calculations – this is going to be the first post of our “What’s in the black-box?” series.

This new feature in TDG covers mainstream biological phosphorus removal. The design process can be separated into two steps:

  • The first is an initial calculation using spreadsheet-based methods available in public literature to define proper reactor volumes, recirculation ratios, and so on.
  • The second step is verification with process simulation. If simulation results indicate that with the initially calculated volumes of ratios and recycle flows that the system cannot meet the effluent criteria, process parameters are adjusted and the simulation runs again, up until the effluent concentrations are below the target values.

access the Article!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online