Case Study

Case Study: The Rehabilitation Of 43-Year-Old Waste Lagoons

By Dale Klussman

In 1967 the City of Concordia, MO built a segmented lagoon system to handle the small town’s waste requirements. The main industry in Concordia is a Tyson renderings plant, and the lagoon system was designed to also handle that plant’s final waste and water polishing requirements. The lagoon system was a relatively standard design, consisting of an 18.7 acre primary lagoon, a 5.6 acre secondary, and a 3.2 acre final lagoon. All lagoons average 6 feet in depth, with the final outfall being received by a southeasterly flowing Panther Creek. A number of vertical spray aerators were placed in the primary lagoon in order to provide water turnover and dissolved oxygen (DO) to the system.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online