Product/Service

Tank Maintenance and Rehabilitation Engineering

Tank maintenance engineering for a storage tank system involves four phases --- initial evaluation and tank washout, prioritization of tank maintenance requirements, preparation of plans and specifications, and quality control evaluation coupled with contract administration.
Tank maintenance engineering for a storage tank system involves four phases --- initial evaluation and tank washout, prioritization of tank maintenance requirements, preparation of plans and specifications, and quality control evaluation coupled with contract administration. Having evaluated over 2500 tanks, Tank Industry Consultants has an extensive database of problems associated with tank ownership. This background provides the basis for designing out future maintenance problems. In all, no other firm offers the expertise in tank maintenance engineering that TIC offers.

Tank Industry Consultants works closely with the owner/operator to establish operating goals and evaluates existing tank operating procedures. From this evaluation, TIC develops written guidelines for properly operating and maintaining the tank system for optimum performance and longevity. These guidelines are clearly written for use by the operating personnel and often replace the "word of mouth" operating instructions that lead to problems and additional costs.

Tank Industry Consultants, Inc., 7740 West New York Street, Indianapolis, IN 46214. Tel: 317-271-3100; Fax: 317-271-3300.