Datasheet | June 1, 2020

Sewage Treatment Large Train System

The newterra WWT-125 is a scalable sewage treatment plant based on 3-container process trains that can each address the requirements of 500 people (125 m3; 33,000 US gal). The advanced, modular system is designed for larger camps with populations ranging from 1,000 to tens of thousands of people.

Base Unit features include:

  • 125 m3 capacity (33,000 US gal)
  • Advanced MicroClear™ UF membranes meet the most stringent regulatory requirements for discharge and reuse
  • Runs operator-free for a minimum of 7-days
  • Integrated spill prevention & containment
  • Each train can be independently operated
  • Advanced telemetry for remote control, monitoring & diagnostics
  • Integrated sludge management system produces dry solids in the range of 20-25%
  • Low power & chemical requirements
access the Datasheet!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online