Datasheet | June 1, 2020

Sewage Treatment Large Train System

The newterra WWT-125 is a scalable sewage treatment plant based on 3-container process trains that can each address the requirements of 500 people (125 m3; 33,000 US gal). The advanced, modular system is designed for larger camps with populations ranging from 1,000 to tens of thousands of people.

Base Unit features include:

  • 125 m3 capacity (33,000 US gal)
  • Advanced MicroClear™ UF membranes meet the most stringent regulatory requirements for discharge and reuse
  • Runs operator-free for a minimum of 7-days
  • Integrated spill prevention & containment
  • Each train can be independently operated
  • Advanced telemetry for remote control, monitoring & diagnostics
  • Integrated sludge management system produces dry solids in the range of 20-25%
  • Low power & chemical requirements
VIEW THE DATASHEET!
Signing up provides unlimited access to:
Signing up provides unlimited access to:
  • Trend and Leadership Articles
  • Case Studies
  • Extensive Product Database
  • Premium Content
HELLO. PLEASE LOG IN. X

Not yet a member of Water Online? Register today.

ACCOUNT SIGN UP X
Please fill in your account details
Login Information
I'm interested in newsletter subscriptions.
ACCOUNT SIGN UP

Subscriptions

Sign up for the newsletter that brings you the industry's latest news, technologies, trends and products.

You might also want to: