Post-Treatment Aeration Maintains Dissolved Oxygen In Effluent High-Solids Wastewater Prior To River Discharge
Source: Mazzei Injector Company, LLC
The LeSourdsville WWTP in Butler County, Ohio, was required to meet their NPDES permit requirement of 6 mg/l dissolved oxygen at the plants Miami River outfall. During normal operation the dissolved oxygen increase is accomplished in a cascade basin. However, during storm events, the river can rise to levels that completely flood the cascade basin rendering it useless.
Read the full case study to learn how Mazzei AirJection system was chosen as the best available technology for the project.
access the Case Study!
Log In
Get unlimited access to:
Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue.
X
Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.
Subscribe to Water Online
X
Subscribe to Water Online
This website uses cookies to ensure you get the best experience on our website. Learn more