The LeSourdsville WWTP in Butler County, Ohio, was required to meet their NPDES permit requirement of 6 mg/l dissolved oxygen at the plants Miami River outfall. During normal operation the dissolved oxygen increase is accomplished in a cascade basin. However, during storm events, the river can rise to levels that completely flood the cascade basin rendering it useless.
Read the full case study to learn how Mazzei AirJection system was chosen as the best available technology for the project.