Case Study

Fast-Tracked Arsenic Project For Food Processing Plant

Fast-Tracked Arsenic Project For Food Processing Plant

AdEdge Water Technologies was recently engaged by Pharmaceutical Services & Installations (PSI) to provide a treatment option for the Century Packaging Corporation in Las Piedras, Puerto Rico. The packaging facility has a water-supply well which pumps water to a 30,000 gallon storage tank and has a daily utilization of 60,000 gallons per day. Water-quality analyses revealed that arsenic concentrations exceeded the new maximum contaminant level (MCL). AdEdge Technologies Inc. (AdEdge) presented a proposal and was awarded the project for arsenic treatment using adsorption based granular ferric oxide (GFO) technology. AdEdge worked closely with PSI and plant’s engineer Vincenty, Heres & Associates. (VHA) to prepare submittals for approval and subsequent installation of the system. The system was rapidly constructed, shipped, and commissioned in approximately 6 weeks. It was the first arsenic treatment system AdEdge has deployed in Puerto Rico.

VIEW THE CASE STUDY!
Signing up provides unlimited access to:
Signing up provides unlimited access to:
  • Trend and Leadership Articles
  • Case Studies
  • Extensive Product Database
  • Premium Content
HELLO. PLEASE LOG IN. X

Not yet a member of Water Online? Register today.

ACCOUNT SIGN UP X
Please fill in your account details
Login Information
I'm interested in newsletter subscriptions.
ACCOUNT SIGN UP

Subscriptions

Sign up for the newsletter that brings you the industry's latest news, technologies, trends and products.

You might also want to:

AdEdge Water Technologies, LLC.