Case Study

Alleviating A Bottleneck In Proposals For An Innovative Water Firm

iStock-1153646979

Problem:

Organica's engineering team was facing a bottleneck in their proposal process. They had more proposals that needed to be created than they could generate with their existing staff.

Needs:

Organica needed a solution to reduce the non-billable engineering hours required to generate proposals. They wanted more time to:

  • Respond to more proposals
  • Utilize their engineers for complex, value added work

In addition to being faster, the solution needed to generate designs at, or above, the quality that the existing engineers could.

VIEW THE CASE STUDY!
Signing up provides unlimited access to:
Signing up provides unlimited access to:
  • Trend and Leadership Articles
  • Case Studies
  • Extensive Product Database
  • Premium Content
HELLO. PLEASE LOG IN. X

Not yet a member of Water Online? Register today.

ACCOUNT SIGN UP X
Please fill in your account details
Login Information
ACCOUNT SIGN UP

Subscriptions

Sign up for the newsletter that brings you the industry's latest news, technologies, trends and products.

You might also want to: