Case Study

AFC Hydrants And Valves With Alpha Joints Offer Time Savings And Efficiency For Somerville, Massachusetts

somerville

In this case study, learn why AMERICAN Flow Control's ALPHA restrained joint technology is being utilized in the Spring Hill Sewer Separation Project in Somerville, Massachusetts. The project involves the installation of 172 hydrants, gate valves, and over 16,000 feet of ductile iron pipe. The ALPHA joint offers time-saving benefits and efficiency for the contractor due to its easy installation and ability to navigate narrow roads and heavy traffic.

P. Gioioso & Sons (PGS), the contractor for the project, chose to use AFC valves and hydrants with ALPHA restrained joints based on their positive experience with the technology on a previous project. The ALPHA joint restraint can be quickly installed by one person using one stainless-steel bolt, making it cost-effective. The Spring Hill project aims to upgrade the existing combined sewer system and implement street safety improvements and green infrastructure. Multiple crews are working day and night to complete the project.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online

AMERICAN - American Cast Iron Pipe Company