Brochure | June 3, 2009

Brochure: Adedge Technologies Mining Projects Summary

In 2005, AdEdge Technologies Inc. (AdEdge) was contacted to provide equipment related design and implementation services to the Newmont Mining site located near Battle Mountain, NV. AdEdge worked with RTW/Tetratech to evaluate arsenic treatment options, and selected adsorption for the Newmont TS power plant potable water system. AdEdge fabricated an APU-25 lead/lag arsenic removal system designed for up to 25 gpm maximum flow. The adsorption system utilizes granular ferric oxide media. The small footprint system features a twin vessel configuration with automatic controls, series flow configuration, and a chlorine injection system.

access the Brochure!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online