A design/build contractor needed a quiet, efficient aeration system for a 250,000 GPD field erected WWTP that was to be located adjacent to a school. A restriction on ambient noise at the location of the proposed WWTP required a quiet aeration process. Read the full case study to discover how Mazzei solved the problem.