ABOUT ADVANCED VALVE TECHNOLOGIES (AVT)
Advanced Valve Technologies’® (AVT) EZ Valve® insertion valve, can be installed on water pipelines sized from 1.5” to 24" (40mm to 600mm) without shutting off the water by using an innovative install process.
CONTACT INFORMATION
Advanced Valve Technologies (AVT)
800 Busse Road
Elk Grove Village, IL 60007
UNITED STATES
Contact: Emma Ardley-Batt
AVT CASE STUDIES
-
A major Texas-based refinery provides significant feedstock flexibility and product diversity to the area’s operations. The plant dates to the early 1900s and following upgrades now produces more than 125,000 barrels per day. A vital element of any refinery is its ability to be constantly ready to respond to a fire, so when the refinery found an inoperable valve on its 12” carbon steel fire suppression line and was in need of a way to add a valve to their system without shutting down the line, their maintenance and repairs contractor, ISS, suggested installing an AVT EZ Valve.
-
The installation of an AVT EZ Valve has helped to future-proof the water system of a university utility system in a Northeastern U.S city. AVT’s newest certified installer Millennium Industrial Services fit the insertion valve to create a control point on the water line that feeds the facility’s boiler. This enabled a current required repair and future works to take place without the need to shut off the water supply to the whole building.
-
Water storage tanks are critical to communities because they provide clean water to residents and help meet peak demand. Regular inspections and maintenance ensure that everything works as intended so end users have reliable access to water when it is needed.
-
The City of Papillion in Nebraska is home to around 20,000 residents who receive their water from two large water towers. These towers are fed by a pump station with the original pipeline infrastructure dictating that both towers needed to be filled simultaneously.
-
The AVT EZ Valve provided an efficient solution at the Sellafield Nuclear Site in Europe, saving valuable time and keeping a multi-million-pound project moving on schedule.
-
Ensuring the provision of an ongoing water supply is never more important than when it’s required by hospitals and medical centers, so when a North Texas city identified the need to create a permanent control point as well as isolate an area so a repair could be made to a water main, they called on Texas Hot Taps for a solution.
-
When a 40-year-old booster pump servicing Ochsner Health Centre in Baton Rouge, La began to falter, officials knew that had to resolve the issue fast. COVID-19 had left the hospital at full capacity so turning off the facility’s water was not an option. The pump’s existing control point was inoperable, so a new valve needed to be installed.
-
Hydratec Services, a trusted long-term partner of AVT, was called on to assist with the repair of a leaking fire hydrant in an East Texas location.
-
When a leak and burst was identified on LTHW (low temperature, hot water) 10” pipes in a UK hospital, turning off the water to fix the issue was not an option. The hospital needed its water supply to remain on to ensure it could continue to treat patients. Following an 18-month investigation into the issue, the hospital’s contractor Morris Mechanical Services, contacted AVT’s UK installer R2M Site Services who suggested installing a number of AVT EZ Valves to create control points enabling repairs to be made.