Product/Service

Sewage Treatment Large Train System: WWT-125

Sewage Treatment Large Train System_Datasheets_WWT-125

The newterra WWT-125 is a scalable sewage treatment plant based on 3-container process trains that can each address the requirements of 500 people (125 m3; 33,000 US gal). The advanced, modular system is designed for larger camps with populations ranging from 1,000 to tens of thousands of people. A base system consists of five 40' containers: a Screen/Master Control unit, a three-unit Process train (one Equalization container, one Aeration container, and one Membrane container), and a Sludge Management unit. The Screen/Master Control & Sludge Management units can support up to four Process trains.

Need More Information? Just Ask.

Click the button below to directly contact the supplier. Use it to:

  • Ask a question.
  • Request more detailed information or literature.
  • Discuss your current project/application.
  • Request a quote.
  • Locate a distributor in your area.
  • Schedule a demo.
Request Information