Case Study

Repair Of Failed Fusion Joint On 36" High Density Polyethylene Pipe Force Main

 Repair Of Failed Fusion Joint On 36” High Density Polyethylene Pipe Force Main

On July 26, 2013 Gainesville Regional Utilities discovered a pipeline failure at a butt-fused welded joint on a 36” HDPE Sewer Force Main. It was determined that the joint failed due to a combination of several incorrect construction methods used during the installation of the pipeline. Once discovered, GRU installed JCM 102-3600 x 18” wide Multi Band Universal Clamp Couplings (4-band clamp) to temporarily seal the leak while a permanent repair was considered.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online