Repair Of Failed Fusion Joint On 36" High Density Polyethylene Pipe Force Main

Source: JCM Industries, Inc.
 Repair Of Failed Fusion Joint On 36” High Density Polyethylene Pipe Force Main

On July 26, 2013 Gainesville Regional Utilities discovered a pipeline failure at a butt-fused welded joint on a 36” HDPE Sewer Force Main. It was determined that the joint failed due to a combination of several incorrect construction methods used during the installation of the pipeline. Once discovered, GRU installed JCM 102-3600 x 18” wide Multi Band Universal Clamp Couplings (4-band clamp) to temporarily seal the leak while a permanent repair was considered.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online