Case Study

Repair Of Failed Bolt Coupling Connection From Pit Cast Iron Pipe To High Density Polyethylene Pipe

Repair Of Failed Bolt Coupling Connection From Pit Cast Iron Pipe To High Density Polyethylene Pipe

On December 25, 2017, a leak was reported to the Colorado Springs (Springs Utilities). The Crew members excavated and exposed the pipe discovering a leaking 24” bolted transition coupling joining 24” Cast Iron Pipe to 24” High Density Polyethylene Pipe. Read the full article to learn how JCM Industries worked with the utility to repair the leak in a timely manner.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online