Case Study

Project Profile: Ohio Willow Wood, Mount Sterling, Ohio, 30 GPM Arsenic, Iron & Manganese System

In the winter of 2006 AdEdge Technologies, Inc. was pre-selected to as the treatment vendor to provide a system for arsenic, iron and manganese removal at the Ohio Willow Wood Facility in Mount Sterling, Ohio. To satisfy OEPA requirements, a pilot was installed to verify the effectiveness of the AD26 oxidation / filtration technology to reduce the target contaminants to below their respective MCLs. The pilot results concluded the success of the removal of the target contaminants and the project proceeded to design and implementation with the site’s engineer, Burgess and Niple. Approval was received by OEPA and a full scale system was installed at the Ohio Willow Wood Co. facility in March of 2008.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online