Case Study

N-Pumps Eliminate Clogging, Cut Energy Bills, And Eliminate Unscheduled Maintenance Calls In Wisconsin

VillageOfHeatland.jpg

In the village of Hartland, Wisconsin, submersible pumps at the village’s lift stations were frequently becoming clogged, resulting in emergency service calls to remove debris. The unscheduled calls had become a major expense, as overtime hours and unplanned maintenance costs increased.

The Village replaced two multi-channel-equipped submersible pumps with two Flygt brand 5-horsepower pumps. While the primary goal of the pump replacement was to resolve the clogging problem and put an end to costly and troublesome emergency service calls, the village of Hartland soon recognized a significant side benefit: a dramatic reduction in energy use. Read the full case study to learn more.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online