Case Study

Maximum Ozone Transfer Efficiency Across Broad Range Of Water Flow

Maximum Ozone Transfer Efficiency Across Broad Range of Water Flow_PIX

The design team for the intermediate ozone system at Buckingham Water Treatment Plant, Quebec, had limited space available for ozone contacting for the plant’s 1.3 – 7.4 MGD flow, so a standard fine bubble diffusion basin for ozone disinfection was not an option. To minimize cost, the engineers proposed a non-ozone resistant pipeline constructed of HEDP for the process. Read the full case study to learn more.

VIEW THE CASE STUDY!
Signing up provides unlimited access to:
Signing up provides unlimited access to:
  • Trend and Leadership Articles
  • Case Studies
  • Extensive Product Database
  • Premium Content
HELLO. PLEASE LOG IN. X

Not yet a member of Water Online? Register today.

ACCOUNT SIGN UP X
Please fill in your account details
Login Information
I'm interested in newsletter subscriptions.
ACCOUNT SIGN UP

Subscriptions

Sign up for the newsletter that brings you the industry's latest news, technologies, trends and products.

You might also want to: