Case Study

JICA Assisted Guwahati Water Supply Project

hammer-connect

The water system for Guwahati, the largest city in the northeastern region of India, was originally built to harness the Brahmaputra River with a gravity-based distribution system. Unregulated development led to water supply problems, as well as high water pressure in 60% of the system. To improve water distribution and the quality of life for residents, NJS Engineers India was tasked with constructing or upgrading water infrastructure throughout the city, including 36 kilometers of transmission mains, 1,155 kilometers of distribution pipes, 1.42 million service connections, a treatment plant, pumping stations, and other infrastructure. Due to the size of the project, NJS needed to combine design, construction management, and hydraulic models into a single platform.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online