Insta-Valve 250 Isolates Wastewater Digester Pumps When Previous Valves Failed

As part of a project for the South Wastewater Treatment Plant run by the Department of Environmental Services (DES) for the East Baton Rouge Parish Wastewater System, the digester pumps on their sludge lines required maintenance or repair.
Unfortunately, the DES could not effectively isolate the pumps due to inoperable and faulty valves. Due to the necessary continuous operation of the pump station, shutdowns and bypass pumping were neither realistic nor cost-effective solutions.
In this case study, discover how the Insta-Valve 250 provided a targeted control to rehabilitate or replace valves and pumps without shutting down the wastewater pump station.
Get unlimited access to:
Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.