Case Study

Insta-Valve 250 Eliminates Widespread Service Outage During Pipe Replacement Project

Source: Hydra-Stop
insta-valve250-prescott

Water Operations, a Division of Public Works for the City of Prescott, Arizona, provides water to the city’s businesses, schools, hospitals, and more than 45,000 residents. The department also oversees installing and maintaining the city’s underground water infrastructure and fire protection.

Their water distribution system consists of ductile iron (DI), asbestos cement (AC), and C900 PVC pipe, but their long-term plan is to replace their AC pipe. Unfortunately, a lack of control points could cause system shutdowns for large portions of the city.

In this case study, discover how Hydra-Stop's insertion valve provided targeted control for the AC pipe removal project without widespread service outages.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online