White Paper

Increase Productivity And Decrease Cost When Fusing HDPE Pipe

Source: McElroy Manufacturing, Inc.

By Jim Craig, P.E.

The logistics of a jobsite often require creative solutions to eliminate escalating demand for manpower and machinery. The addition of these elements to a jobsite can produce huge cost increases. McElroy’s PolyHorse was developed to strategically position pipe on a butt fusion jobsite, decreasing the overall time required to perform the job, as well as the manpower and machinery needed to maneuver pipe.

Improving efficiency, productivity, and safety on the jobsite is always important. After studying jobsites in a variety of markets, we determined that a key to improving efficiency, productivity, and safety is in job set-up and pipe handling. Usually, making more pipe joints per day involves more machines and operators, thus increasing costs. With the information gathered from studies, a new pipe-handling system, the PolyHorse™, was developed by McElroy. This system strategically stages the pipe on the jobsite, allowing you to increase the number of joints produced per day and eliminate some labor and loading equipment in the process.

access the White Paper!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online