Case Study

Green Lakes, WI, HeadCell Protects Downstream Processes

Source: Hydro International

The original plant in Green Lakes, WI, was built in 1983 and did not include grit removal. As a result, grit accumulated throughout the plant process tanks, particularly the aeration basin. This required periodic shutdown of the process tanks and hiring a contractor to vacuum the deposited grit from the tanks. The pending upgrade would include the use of an SBR treatment system as well as an upgrade to sludge dewatering. Plant personnel were concerned about grit settling in the process tanks, as well as grit wearing on the belts and rollers of the new belt filter press that would be used for sludge dewatering. The impact of these problems drove the plant to include grit removal in their upgrade project.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online