Case Study

Full Scale Installation: City Of Grand Island, Nebraska

Source: WRT - Water Remediation Technology, LLC

Design Flow: 3,500 GPM

Projected Annual

Water Production: 1.5 billion gallons

Uranium in Untreated Water: 35.1 μg/L

Uranium Discharge Design Level: <5.3 μg/L

Dual 1,750 GPM treatment trains with two vessels per train

Vessel Dimensions: 14’ diameter x 12’ high

Vessel Type: Lined carbon steel vessels

Hydraulic Loading Rate (System):11.5 gpm/sq.ft.

Empty Bed Contact Time (System): 8.0 minutes

Z-92® Uranium Removal Media: 930 cubic feet per vessel, 3,720 cubic feet total