Case Study

Full Scale Installation: City Of Grand Island, Nebraska

Design Flow: 3,500 GPM

Projected Annual

Water Production: 1.5 billion gallons

Uranium in Untreated Water: 35.1 μg/L

Uranium Discharge Design Level: <5.3 μg/L

Dual 1,750 GPM treatment trains with two vessels per train

Vessel Dimensions: 14’ diameter x 12’ high

Vessel Type: Lined carbon steel vessels

Hydraulic Loading Rate (System):11.5 gpm/sq.ft.

Empty Bed Contact Time (System): 8.0 minutes

Z-92® Uranium Removal Media: 930 cubic feet per vessel, 3,720 cubic feet total

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online

WRT - Water Remediation Technology