Case Study

Filtration System For Thermoelectric Plant

Source: Amiad Water Systems
Filtration System Thermoelectric Plant

AES Gener is the second generating company in Chile and the main thermoelectric generator, and provides 4.068 MW (including Guacolda S.A.), equivalent to a share of 22%, whereas 3.797 MW of thermoelectric capacity and 271 MW of hydroelectric capacity.

The plant provides electrical power to the Norte Grande Interconnected System (SING) through its subsidiaries: Norgener S.A. (Norgener), Empresa Electrica Angamos S.A. (Electrica Angamos) and TermoAndes S.A. (TermoAndes) in Argentina.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online