Case Study

Case Study: Pilot Testing - Potassium Sulfate Crystallization, IC Potash Corp.

Source: Veolia Water Technologies

ICP’s Ochoa Mine Project is projected to produce approximately 714,000 tons per year of SOP (K2SO4) from polyhalite ore for greater than fifty years as concluded in a feasibility study.

Another part of the feasibility study was the demonstration of a unique process, based on research that dated back nearly a century, to produce SOP economically while maintaining a high-quality, specialty fertilizer product.

ICP selected Veolia Water Technologies to refine the process due to their experience in the industry and overall development capabilities for crystallization process design using HPD® Technology. A series of tests were conducted to simulate various stages of the proposed flowsheet with the goal of validating the overall design.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online