Case Study

Case Study: City Of Johnstown, CO

Source: Veolia Water Technologies

Stricter regulations forced the town of Johnstown, Colorado to examine alternatives for an upgrade to their existing system.

Originally, the Johnstown site consisted of a series of three lagoons built in the 1950’s, with the most recent upgrade taking place in 1980. The city was faced with expanding their treatment capacity, along with meeting lower ammonia limits. The effluent discharge standards required the city to meet the new ammonia limits year round.

The wastewater temperature in the plant is low (<7°C/ 45°F) during winter making it difficult to nitrify on a consistent basis. In order to meet the nitrification limits, the city had two options to choose: build a new activated sludge plant, or use their existing facility and install an AnoxKaldnes™ LagoonGuard™ treatment system. The MBBR process was estimated to cost 50% less than the activated sludge alternative.

The city chose to install the AnoxKaldnes™ LagoonGuard™. Two trains of two Moving Bed Biofilm Reactors in series were added after Lagoon 2, along with a DAF at the end of Lagoon 3.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online