Royal Environmental Systems And Water Tectonics Design State-Of-The-Art Stormwater Treatment System
Case Study: Royal Environmental Systems And Water Tectonics Design State-Of-The-Art Stormwater Treatment System
McRedmond Regional Water Quality Facility
Challenge
Located 20 miles east of Seattle, Washington, Redmond is
home to 50,000 residents and many high-tech and
biomedical companies, including Microsoft. Redmond's
downtown drainage area is dominated by commercial,
industrial and roadway areas, with typical surface
pavement contaminants such as metals, nutrients and
sediments.
Redmond's stormwater flows into the Sammamish River and Lake Sammamish, important waterbodies for rearing and migrating salmon species. To help prevent stormwater runoff from harming these waterways, the City of Redmond developed stringent stormwater regulations and sought a permanent stormwater treatment system that exceeded existing environmental guidelines.
Click Here To Download:
Case Study: Royal Environmental Systems And Water Tectonics Design State-Of-The-Art Stormwater Treatment System
SOURCE: Royal Environmental Systems, Inc.