Advanced Water Wastewater Treatment

December 13, 2006

Click Here To Download:
Case Study: Advanced Water Wastewater Treatment

The Situation
To meet the demands of rapid growth, the city of Mandarin, Florida, has instituted a multi-stage wastewater treatment plant. When Schneider Automation was contracted to provide controls for the new multimillion dollar facility, construction was underway and buildings were already being erected.

The Mandarin WWTP consists of two unique recycling systems, each with sludge tanks that must be recycled to maintain a certain chemical composition. To accomplish this, a process variable had to be established and a control system put in place to drive the pumps and keep the flow rate steady.