Case Study

Shanghai Investigation Sets BIM Standard On Ningbo Yongxin's Urban Flood Control Project

Source: Bentley Systems
Shanghai Investigation Sets BIM Standard On Ningbo Yongxin’s Urban Flood Control Project

In response to the devastation from a 2013 typhoon that caused the Yongxin and Yongjiang rivers in Ningbo, China to overflow, Ningbo Raw Water Group Ltd. commissioned the detailed design and construction of a CNY 178 million emergency sluice pump. The pump would provide flood control measures and mitigate future flood losses to improve urban infrastructure services within the Zhejiang province. To avoid the risk of additional flooding from another typhoon, the Raw Water Group required the urban flood control project to be delivered in a demanding eight-month schedule—a process that would ordinarily take 24 months to complete.