Measuring Irregular Flow Intervals Of Cooling Tower Blowdown Water

plant

The accurate measurement of cooling tower blowdown water flowing at irregular intervals prior to reinjection into a caprock well became a stubborn problem for Covanta Energy Corp at the Honolulu H-POWER Facility on the island of Oahu, HI. The irregular flow intervals created foam and bubbles in the line, which required a next-generation flow meter solution.

Jeff Vaughan, chief engineer, said, “The FPI Mag Flow Meter from McCrometer solved our problem and performs as advertised. I watched the FPI video and showed it to the installer. There was no need to shut down the line (and the whole plant) for a ten-minute meter job.”

According to Vaughan, the accurate measurement of the cooling tower blowdown water before reinjection into the facility’s caprock well is essential to remain within the 2 million gallon per day permit held by the facility. “We have to remain within our permit requirement, and our typical water flow rate is slightly less than that amount.”

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online