Case Study

Filtration Of Cooling Tower Sidestream To Prevent Heat Exchanger Fouling

Source: Amiad Water Systems

Filtrationcoolingtowersidestream

A large electric utility company installed five new GE LM100 gas turbines for expansion of their existing power station and for their new power station in the El Paso, TX area.

The expansion and the new power plant were necessary to meet growing demand from the community and the expanding Fort Bliss U.S. Army Base.

The first system was installed at the existing power station and the additional 2 systems were installed at the new one.