Case Study

Double Duty Fusion Technicians Play Piggyback

Source: McElroy Manufacturing, Inc.
Brian Shields squints his eyes and stares into the wavy heat-blurred mirage floating over the twin polyethylene pipelines stretching into the Utah desert. A pair of McElroy fusion machines is spitting out 80 feet of new pipeline every 15 minutes while a single fusion technician slowly paces between them like an expecting father. Shields slides his hardhat off to expose his shaved head to the August sun and says, "In a total of 12 days, we'll be pumping water through a new 22,000 foot HDPE pipeline."
access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online