Case Study

Challenging Turnkey Installation Of Five Raw Water Pumps

challenging_turnkey_installation_of_five_raw_water_pumps_a10292-1.jpg

For one city in Texas, accessing a new source of water required considerable expertise in pumping technology. The pumping station was to be located 320 feet (98 meters) above the 9 ft (2.7 meter) tunnel that carries the water from the intake system in the lake. The water had to travel almost a mile (1.6 km) uphill to the water treatment plant, so a considerable amount of civil engineering was required. Read the full case study to learn how the SJT large vertical pump was determined to be the most suitable pump for this project.

VIEW THE CASE STUDY!
Signing up provides unlimited access to:
Signing up provides unlimited access to:
  • Trend and Leadership Articles
  • Case Studies
  • Extensive Product Database
  • Premium Content
HELLO. PLEASE LOG IN. X

Not yet a member of Water Online? Register today.

ACCOUNT SIGN UP X
Please fill in your account details
Login Information
I'm interested in newsletter subscriptions.
ACCOUNT SIGN UP

Subscriptions

Sign up for the newsletter that brings you the industry's latest news, technologies, trends and products.

You might also want to: