Downloads


Case Study: Town Of Banff, Alberta, Canada

PPG Industries, Inc.

File Size: 686.8 KB   Estimated Download Time: < 1 min
Description

The town of Bannf's water system serves a population of 8,100, which can swell to as high as 50,000 during holidays. Average treatment rate of the ground water is 8,000 cubic meters a day, with a peak of 13,500 cubic meters during the summer months.

Need Information?

Search:

Tips

Please wait... busy

Send This Page To An Associate: