Downloads


Case Study: Hertzeliya WWTP Upgrading Project

GES - Global Environmental Solutions

File Size: 661.1 KB   Estimated Download Time: < 1 min
Description

Hertzeliya wastewater treatment plant (wwtp) was built in the 1970's in order to treat the city's municipal wastewater to a secondary level of 20/30, mg/l, (Biological Oxygen Demand/Total Suspended Solids). This will be achieved by an activated sludge extended aeration processes. The sludge is stabilized aerobically.

Need Information?

Search:

Tips

Please wait... busy

Send This Page To An Associate: