Case Study | January 29, 2014

Resolving High PH For Mining Operations

Source: Fortrans, Inc.
SolvingHighPHMining

For an open-pit taconite mining operation in Minnesota, high pH groundwater required round-the-clock pumping to comply with discharge permit limits. After management installed a control system to neutralize the pH, the treated water leaving the site now meets permit limits. Read this case study to learn more about the installed system and results.

For full access to this content, please Register or Sign In.

Access Content Resolving High PH For Mining Operations
Newsletter Signup
Newsletter Signup
By clicking Sign Me Up, you agree to our Terms and that you have read our Privacy Policy.