Case Study | April 15, 2014

Pump Station Bar Screen Saves City $26,000 In Labor

Source: Aqualitec Corp.

New Jersey’s Lower Township Municipal Utilities Authority had a problem. The utilities authority operates a 5 MGD plant, with wastewater inflow arriving through a 48-in pipe routed 23 feet below grade level. Their manual inflow pump screening setup was difficult and hazardous to clean, and its 2.5” screen spacing let entirely too much non-dispersible waste through. Their 3,000 GPM non-clog pumps were constantly clogging, and workers were repeatedly exposed to a hazardous situation.

Each day, a crew of two to three workers had to descend a 26’ stairwell into a dark, hazardous environment to manually remove accumulated debris from the screen. Scooping the refuse with gloved hands caused additional non-dispersible trash to fall through the large openings between screen bars, and workers had to haul heavy buckets full of debris up the steep, damp steps to a nearby dumpster. Hefting the heavy buckets overhead caused a number of strain injuries over the years, and hazardous hydrogen sulfide levels often necessitated expensive overtime work to clear the screens very early in the morning.

For full access to this content, please Register or Sign In.

Access Content Pump Station Bar Screen Saves City $26,000 In Labor