Case Study

Headworks Improvements Resulted In Significant Reduction Of Maintenance

Previously the crew at Payson WWTP wrestled with clogs that required constant attention and increased system downtimes. With the installation of the new headworks, the comparison was stark because suddenly the flow from the headworks was debris-free. The new headworks was producing a clean flow and clean solids. The key for the Payson crew was protecting their sludge pumps. Plugged up sludge pumps easily consumed his team’s time and caused considerable frustration on a consistent basis with the older installation. With the STEPSCREEN® implementation, no pumps became plugged. It was clear that the headworks technology was not just meeting but surpassing expectations.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online