Full Scale Installation: City Of Grand Island, Nebraska
Design Flow: 3,500 GPM
Projected Annual
Water Production: 1.5 billion gallons
Uranium in Untreated Water: 35.1 μg/L
Uranium Discharge Design Level: <5.3 μg/L
Dual 1,750 GPM treatment trains with two vessels per train
Vessel Dimensions: 14’ diameter x 12’ high
Vessel Type: Lined carbon steel vessels
Hydraulic Loading Rate (System):11.5 gpm/sq.ft.
Empty Bed Contact Time (System): 8.0 minutes
Z-92® Uranium Removal Media: 930 cubic feet per vessel, 3,720 cubic feet total
access the Case Study!
Log In
Get unlimited access to:
Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue.
X
Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.
Subscribe to Water Online
X
Subscribe to Water Online
WRT - Water Remediation Technology
This website uses cookies to ensure you get the best experience on our website. Learn more