ELCOGAS – ZLD for IGCC Power Plant – Puertollano, Spain
Source: Veolia Water Technologies
ELCOGAS, established in 1992 with the aim of building and operating a 335 MW Integrated Gasification Combined Cycle (IGCC) power plant as well as the commercialization of its technology.
Based on the PRENFLO™ gasification process, the plant uses a mixture of local coal (from ENCASUR) with a high-ash content and petroleum coke produced at a nearby REPSOL refinery as feedstock.
access the Case Study!
Log In
Get unlimited access to:
Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue.
X
Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.
Subscribe to Water Online
X
Subscribe to Water Online
This website uses cookies to ensure you get the best experience on our website. Learn more