Case Study


Water Infiltration - Manholes Project Profile

       To access this content please Register or Sign In.   
Details

ManholesProjectProfiles

Large diameter (8 ft. ID) manholes were leaking extensively and almost constantly through joints in precast sections and around penetrations. A material was required that would flow into tight spaces and also set up rapidly enough that it would not be washed away before curing.

The dual cartridge application accomplished this, allowing the contractor to move rapidly around the entire diameter of leaking joints and penetrations without the need for a pump, hoses or exterior mixing of various components.

Downloads

       To access this content please Register or Sign In.   
Water Infiltration - Manholes Project Profile

Register Today. It's Fast And Free.

The content you requested is only available to registered users of Water Online. By registering now, you'll get exclusive access to this piece of content and thousands of addtional articles and product reviews across our entire network of sites.

Already Registered? Sign In.

Forgot your password?


Sauereisen, Inc.

More From Sauereisen, Inc.

Please wait... busy